Monday, March 16, 2009

Day 8


OK, took days 6 and 7 off. Installed the new shelf above the toilet, re-installed the toilet, cut out the chunk so the cabinet will go flush with the wall. Still have to have some finish work done to the walls before the cabinet will be installed and the plumbing finished. I pre-drilled through the floor so I can have my RO/DI water for the fish tank set up with just a quick flip of a valve. I'll show more of this when I finish up the plumbing. I have maybe 25 minutes of work left (except for the baseboard trim- not going to do that until my brother returns my nail guns), but I'm at the mercy of the house QC inspector who doesn't think I have the skilz to touch up the sheetrock.